KASCO Developments has officially announced the launch of its debut project ONDA in the heart of Business Bay, Dubai. With a firm focus on well-being and innovative living, this 23-floor freehold community marks KASCO’s entry into Dubai’s real estate sector, with plans to develop and sell 1 million square feet of residential space by 2025.
ONDA will offer a total of 348 residences, comprised of 85 studios with a minimum size of 449 sq ft, 190 one-bedroom units ranging from 848 sq ft, 69 two-bedroom units with a minimum size of 1246 sq ft, and 4 exclusive three-bedroom units starting at 3025 sq ft.
The three-bedroom apartments on the top floor will include private pools, offering a rare and luxurious living experience with breathtaking views of the Dubai skyline. This unique feature aims to elevate the wellness and lifestyle offerings for residents, combining cutting-edge design with health-centric living.
KASCO Developments has made well-being a central theme of the ONDA project. The building will be equipped with state-of-the-art wellness hubs and fitness facilities, including an advanced gym, a running track, and a premium spa featuring a cold plunge and sauna. Additionally, ONDA will offer both indoor and outdoor swimming pools giving residents the flexibility to enjoy fitness year-round.
Mustafa Al Kaissi, Chairman of KASCO Developments, said, "We at KASCO Developments are thrilled to introduce ONDA as our debut project in the UAE. We aim to stand out in Dubai’s rapidly growing market by focusing on client well-being and creating an inspiring living experience."
ONDA is the first of several planned projects under KASCO Developments’ portfolio. Issa Abdul Rahman, CEO of KASCO Developments, added, "Dubai’s real estate market has been growing rapidly over the last three years, and we felt it is time for us to establish a strong base in this market. ONDA is the first of several new projects that we plan to develop, aligning with our vision of crafting spaces that inspire and elevate lifestyle."
The construction of ONDA is set to begin in Q4 2024, with completion and handover expected by Q2 2027.